Environment

Hunterston site

Figures & Plans Table of Contents

CHAPTER 1 - INTRODUCTION
Figure 1.1 Site Context
Figure 1.2 Site Location
Figure 1.3 Site Layout Plan
CHAPTER 2 – NEEDS AND ALTERNATIVES
Figure 2.1 Original Site Layout – Option 1
Figure 2.2 Alternative Site Layout – Option 2
Figure 2.3 Alternative Site Layout – Option 3
CHAPTER 3 – SITE DESCRIPTION
Figure 3.1 Aerial Photograph of the Site
CHAPTER 4 – PROJECT DESCRIPTION
Figure 4.1 Operational Site Boundary and Application Area
Figure 4.2 Flow Diagram of Typical Supercritical Power Station System
Figure 4.3 Landuse Plan
Figure 4.4 Indicative Site Design
Figure 4.5 Landscaping Plan (Hard & Soft)
Figure 4.6 Masterplanning Site Sections A-C
Figure 4.7 Masterplanning Site Sections D-F
Figure 4.8 Powerplant Site Sections A-C
Figure 4.9 Powerplant Site Sections D-F
Figure 4.10 Masterplan Site Elevations (S1 & S2)
Figure 4.11 Masterplan Site Elevations (W1 & N1)
Figure 4.12 Masterplan Site Elevations (E1 & E2)
Figure 4.13 Indicative Internal Layouts
Figure 4.14 Coal Delivery Diagram
Figure 4.15 Drainage Plan
Figure 4.15A Foul Water Network
Figure 4.15B Storm Water Network
Figure 4.16 Water Inlet/Outlet Detail
Figure 4.17 Site Access Arrangements
Figure 4.18 Bulk Materials Movement On and Off Site
Figure 4.19 Construction Laydown Areas
Figure 4.20 Construction Phasing Plan
Figure 4.21 Infilling Sequence – Phase 1
Figure 4.22 Infilling Sequence – Phase 2
Figure 4.23 Infilling Sequence – Phase 3
Figure 4.24 Infilling Sequence – Phase 4
Figure 4.25 Infilling Sequence – Phase 5
Figure 4.26 Indicative Manning Plan
Figure 4.27 Daily Traffic Generation Associated With Construction Workforce Trips
Figure 4.28 Estimated Daily HV Traffic Generation Associated with the Construction Phase
Figure 4.29 Grid Connection
CHAPTER 5 – EIA METHODOLOGY
No accompanying figures or plans
CHAPTER 6 – SCOPING & CONSULTATION
No accompanying figures or plans
CHAPTER 7 – PLANNING POLICY CONTEXT
No accompanying figures or plans
CHAPTER 8 – LVIA
Figure 8.1 Landscape Study Area
Figure 8.2 Landscape Designations (30km)
Figure 8.3 Landscape Character Plan (30km)
Figure 8.4 Landscape Character Plan (15km)
Figure 8.5 Viewpoint Location Plan (30km)
Figure 8.6 Viewpoint Location Plan (5km)
Figure 8.7 Stack Height and Boiler House Combined ZTV with Viewpoints (30km)
Figure 8.8a Stack Height and Boiler House Combined ZTV (30km) Quadrant A
Figure 8.8b Stack Height and Boiler House Combined ZTV (30km) Quadrant B
Figure 8.8c Stack Height and Boiler House Combined ZTV (30km) Quadrant C
Figure 8.8d Stack Height and Boiler House Combined ZTV (30km) Quadrant D
Figure 8.9 Stack Height and Boiler House Combined ZTV (15km) with Landscape Character Areas
Figure 8.10 Horizontal Extent of Plume
Figure 8.11 Stack Height and Plume Height ZTV with CMRP (30km)
Figure 8.12a Stack Height and Plume Height ZTV with CMRP (30km) Quadrant A
Figure 8.12b Stack Height and Plume Height ZTV with CMRP (30km) Quadrant B
Figure 8.12c Stack Height and Plume Height ZTV with CMRP (30km) Quadrant C
Figure 8.12d Stack Height and Plume Height ZTV with CMRP (30km) Quadrant D
Figure 8.13 Viewpoint 1 - Hunterston House
Figure 8.14 Viewpoint 2 - Fairlie, Bay Street
Figure 8.15 Viewpoint 3 - Fairlie, Picnic Site
Figure 8.16 Viewpoint 4 - Great Cumbrae, Millport
Figure 8.17 Viewpoint 5 - Great Cumbrae, The Lion
Figure 8.18 Viewpoint 6 - Largs, Broomfield Place
Figure 8.19 Viewpoint 7 - Largs, Haylie Brae
Figure 8.20 Viewpoint 8 - A78 Northbound Lay-by
Figure 8.21 Viewpoint 9 - West Kilbride, B7048, Portencross Road
Figure 8.22 Viewpoint 10 - Bute, Kilchattan Bay
Figure 8.23 Viewpoint 11 - Dalry Moor Road
Figure 8.24 Viewpoint 12 - Fairlie, Pier Road
Figure 8.25 Viewpoint 13 - Fairlie, Highfield Terrace
Figure 8.26 Viewpoint 14 - Kelburn Castle
Figure 8.27 Viewpoint 15 - Great Cumbrae / Largs Ferry
Figure 8.28 Viewpoint 16 - Great Cumbrae, Glaid Stone Hill
Figure 8.29 Viewpoint 17 - Largs, Bankhead Farm
Figure 8.30 Viewpoint 18 - Rothesay / Wemyss Bay Ferry
Figure 8.31 Viewpoint 19 - Bute, Mount Stuart
Figure 8.32 Viewpoint 20 - Ardrossan / Brodick Ferry
Figure 8.33 Viewpoint 21 - Isle of Arran. Goatfell
Figure 8.34 Viewpoint 22 - Dunoon
Figure 8.35 Viewpoint 23 - Cowal, Toward Point
Figure 8.36 Baseline Lighting Conditions
Figure 8.37 Night Time Viewpoint 1 Millport
Figure 8.38 Night Time Viewpoint 2 Fairlie
Figure 8.39 Night Time Viewpoint 3 West Kilbride
CHAPTER 9 - NOISE
Figure 9.1 Noise Receptor Locations
Figure 9.2 Noise Contour Plot
Figure 9.3 Noise Contour Plot – Mitigated Scenario
Figure 9.4 Noise Contour Plot – Existing Daytime Scenario
Figure 9.5 Noise Contour Plot – Existing Night-Time Scenario
Figure 9.6 Noise Contour Plot – Future Day Time Scenario
Figure 9.7 Noise Contour Plot – Future Night Time Scenario
Figure 9.8 Daytime Noise Level Change
Figure 9.9 Night Time Noise Level Change
CHAPTER 10 – AIR QUALITY
Figure 10.1 Site Locations and Sensitive Human Locations
Figure 10.2 Modelled 99.9th Percentile of 15 Minute Mean Sulphur Dioxide Concentrations (Coal Fired Scenario) (Prestwick 2001 Meteorological data)
Figure 10.3 Modelled 99.7th Percentile of 15 Minute Mean Sulphur Dioxide Concentrations (Heavy Fuel Oil Fired Scenario) (Prestwick 2001 Meteorological Data)
Figure 10.4 Modelled 99.9th Percentile of 15 Minute Mean Sulphur Dioxide Concentrations (Coal and Biomass Fired Scenario with CCS) (Glasgow 2007 Meteorological Data)
Figure 10.5 Modelled 99.7th Percentile of Hourly Mean Sulphur Dioxide Concentrations (Coal Fired Scenario) (Prestwick 2001 Meteorological Data)
Figure 10.6 Modelled 99.7th Percentile of Hourly Mean Sulphur Dioxide Concentrations (Heavy Fuel Oil Fired Scenario) (Prestwick 2001 Meteorological Data)
Figure 10.7 Modelled 99.7th Percentile of Hourly Mean Sulphur Dioxide Concentrations (Coal and Biomass Fired Scenario with CCS) (Prestwick 2001 Meteorological Data)
Figure 10.8 Modelled Annual Mean Nitrogen Dioxide Concentrations (Coal Fired Scenario) (Prestwick 2001 Meteorological Data)
Figure 10.9 Modelled Maximum Vanadium Concentrations (Heavy Fuel Oil Fired Scenario) (Glasgow 2006 Meteorological Data)
Figure 10.10 Modelled Annual Mean Nickel Concentration (Heavy Fuel Oil Fired Scenario) (Prestwick 2001 Meteorological Data)
CHAPTER 11 – TERESTRIAL HYDROLOGY
Figure 11.1 Site Hydrology and Surface Water Drainage
Figure 11.2 Surface Water Catchments
Figure 11.3 Private Water Supplies
CHAPTER 12 – HYDRO-GEOLOGY, GEOLOGY & SOILS
Figure 12.1 Geological and Hydrological Walk-Over
Figure 12.2 Site Geology
Figure 12.3 Observed Groundwater Levels
CHAPTER 13 – COASTAL PROCESSES
Figure 13.1 Bathmetry and Locations
Figure 13.2 Modern High and Low Water Marks
Figure 13.3 Wave Attenuation Zones
Figure 13.4 Rock, Boulder and Gravel Areas
Figure 13.5 Sand Type
Figure 13.6 Percentage Mud (Silt and Clay) In Bed Sediments
Figure 13.7 Nitrogen Content
Figure 13.8 Indicators of Bedload Transport of Sand
Figure 13.9 Works Footprint Shown in Juxtaposition to Key Features of the Natural Environment
CHAPTER 14 – MARINE WATER QUALITY
Figure 14.1 EC Shellfish Growing Waters: Fairlie
Figure 14.2 Measurements of Low Tide Salinity Conditions
Figure 14.3a Figure Description
Figure 14.3b Figure Description
Figure 14.4 Thermal Data Collection Sites
Figure 14.5 Subtidal Temperature Measurements (June to September 2009)
Figure 14.6 Temperature Data
Figure 14.7 Initial Turbidity Results for the Marine Construction Yard
CHAPTER 15 – TERRESTRIAL ECOLOGY
Figure 15.1 Designated Sites
Figure 15.2 Phase 1 Habitat Map
Figure 15.3 Proposed Development Footprint at Time of Survey – Wintering Bird Survey in Technical Appendix
Figure 15.4 Bat Transect Route and Location of Trees with Bat Roost Potential
Figure 15.5 Temporary Reptile Refugee Locations – Terrestrial Ecology Technical Appendix
Figure 15.6 Otter Field Signs - Terrestrial Ecology Technical Appendix
Figure 15.7 Amphibian Survey Area - Terrestrial Ecology Technical Appendix
Figure 15.8 Invertebrate Survey Area – Invertebrate Survey Technical Appendix
Figure 15.9 Fish Habitat Survey – Fish Habitat Survey Technical Appendix
Figure 15.10 Breeding Bird Survey 12/06/08 – Breeding Bird Survey Technical Appendix
Figure 15.11 Wintering Bird Survey – High Tide Wader Roost Sites – Wintering Bird Technical Appendix
CHAPTER 16 – MARINE ECOLOGY
Figure 16.1 Biotope Map
Figure 16.2 Spatial Pattern of Fishing effort of the Sampled Nephrops Fishing Fleet in 2001
Figure 16.3 Construction Footprint
CHAPTER 17 – Archaeology & Cultural Heritage
Figure 17.1 Cultural Heritage Features within the Inner Study Area
Figure 17.2 Cultural Heritage Features within the Middle Study Area
Figure 17.3 Category B and C Listed Buildings within the Middle Study Area
CHAPTER 18 – Traffic and Transportation
Figure 18.1 Road Network Assessed
CHAPTER 19 – Socio-Economic
Figure 19.1 Site Location and Residential Areas within 5km
Figure 19.2 Residential Properties within 500m of the Site
Figure 19.3 Public Rights of Way
CHAPTER 20 – CUMULATIVE ASSESSMENT
No accompanying figures or plans
CHAPTER 21 – MITIGATION & MONITORING
No accompanying figures or plans
CHAPTER 22 – GLOSSARY
No accompanying figures or plans